  4. Footway crossovers - construction and modification by the Straßen- und Grünflächenamt (Roads and Green Spaces Office)

Footway crossovers - construction and modification by the Straßen- und Grünflächenamt (Roads and Green Spaces Office)

Gehwegüberfahrten - Herstellung und Änderung durch das Straßen- und Grünflächenamt
Machine translation of the German page, 2026-09-15. The German original is binding.
• Certification / registration service.berlin.de/dienstleistung/326197/ Non-trafficable parts of the road (e.g. footpaths, green strips) may only be crossed by motor vehicles at specially reinforced crossings (Gehwegüberfahrten [footpath crossings]). To provide access to a garage or a vehicle parking space on private property, these non-trafficable road parts must therefore be lowered and reinforced accordingly. The adjoining property owner is obliged to submit a corresponding application and to bear the construction costs (if applicable, also for replacement tree planting or relocation of a lighting mast). The responsible authority examines this application together with the Fachbereich Grünflächen (Green Spaces Department) as well as the utility and telecommunications companies and the company responsible for street lighting, and issues an approval (Leistungsbescheid [notice imposing the fee]). The adjoining property owner is further obliged to have footpath crossings that are no longer needed removed at their own expense.

Book an appointment

Book an appointment (service.berlin.de)

Requirements

• Applicant must be the owner (proof required – land register extract or notarial contract)

Documents you need

• Application from the adjoining property owner (Anlieger) with a site sketch Application for cases where the responsible authority is to construct the driveway crossing (Gehwegüberfahrt). The application must be submitted in good time before the planned start of construction (at least 10 weeks).

Fees

EUR 100.00 to EUR 800.00 in administrative fees, depending on the effort involved and additionally construction costs depending on size and type. Once the administrative fees and an advance cost payment have been received promptly, the responsible authority (zuständige Behörde) constructs the crossing and settles the account with the adjoining property owner (Anlieger). The same applies accordingly to alterations or extensions of Gehwegüberfahrten (footway crossings).

Legal basis

• § 9 BerlStrG (Berlin Street Act), VGebO (Fee Ordinance) <http://gesetze.berlin.de/jportal/portal/t/8p0/page/bsbeprod.psml/action/portlets.jw.MainAction?p1=e&eventSubmit_doNavigate=searchInSubtreeTOC&showdoccase=1&doc.hl=0&doc.id=jlr-StrGBEV4P9&doc.part=S&toc.poskey=#focuspoint> • Verwaltungsgebührenordnung (Administrative Fees Ordinance) <http://gesetze.berlin.de/jportal/?quelle=jlink&query=VwGebO+BE&psml=bsbeprod.psml&max=true&aiz=true>

Processing time

3 months for construction of the driveway crossing (Gehwegüberfahrt) by the road construction authority (the streets or civil engineering department in the respective Straßen- und Grünflächenamt (Office for Roads and Green Spaces)).

Who is responsible

This service can be used at the Straßen- und Grünflächenamt (Office for Roads and Green Spaces) - Fachbereich Straßen oder Tiefbau (Department of Roads or Civil Engineering) - in the relevant district.

Responsible for you

Choose a location; the appointment itself is booked on the original page.

Original

German original

Service number 324489 · same path as the original: service.berlin.de/dienstleistung/324489/