Special use of public roads (Straßensondernutzung) - apply for the use of excavation pit shoring, drilling walls, and sheet pile walls
Straßensondernutzung - Nutzung von Baugrubenverbauen, Bohr- und Spundwänden beantragen
Machine translation of the German page, 2026-09-15. The German original is binding.
The use of excavation pit shoring, bored pile walls, sheet pile walls and similar temporary construction structures (Baubehelfe) on public street land constitutes a special use of the street land (Straßenlandsondernutzung). The building owner (Bauherr) or the construction company authorized by the building owner is required to apply for a special use permit (Sondernutzungserlaubnis).
Book an appointment
Book an appointment (service.berlin.de)
Requirements
• No requirements
Documents you need
• Application for special-use permit for the use of excavation pit shoring, bored walls and sheet piling walls
You can submit the application either online or in writing by post.
Application by the construction company (with power of attorney from the Bauherr [building owner]) or by the Bauherr, stating the installation location and period.
Forms
• Application for special use for the use of excavation pit shoring, drilled walls, and sheet pile walls (with notes) senstadtfmsv.stadt-berlin.de/intelliform/forms/hinweise/berl
Fees
• 80.00 to 1,200.00 Euro: administrative fee
• 12.50 Euro: additionally per month/anchor, pile, driven pile, or similar, or sheet pile wall including support
or
• 750.00 Euro: additionally per item for remaining tie rods etc., special-use fee
Legal basis
• Berliner Straßengesetz (BerlStrG – Berlin Roads Act) § 11 gesetze.berlin.de/perma?j=StrG_BE_!_11
• Verwaltungsgebührenordnung (VGebO – Administrative Fees Ordinance) gesetze.berlin.de/perma?d=jlr-VwGebOBE2009V14Anlage
• Sondernutzungsgebührenverordnung (SNGebV – Special Use Fees Ordinance) gesetze.berlin.de/perma?d=jlr-SoGebVBEV7Anlage1
• Baumschutzverordnung (BaumSchVO – Tree Protection Ordinance) gesetze.berlin.de/bsbe/document/jlr-BaumSchVBErahmen
Processing time
The application is processed within one month of submission of a complete application.
Note: The one-month approval-by-default period (Genehmigungsfiktion) may be extended once by the authority to two months.
Who is responsible
The use must be applied for in the district in which the use is to take place.
Responsible for you
Choose a location; the appointment itself is booked on the original page.
- Bezirksamt Charlottenburg-Wilmersdorf
- Bezirksamt Friedrichshain-Kreuzberg
- Straßen- und Grünflächenamt
- Bezirksamt Lichtenberg
- Straßen- und Grünflächenamt
- Bezirksamt Marzahn-Hellersdorf
- Straßenverkehrsbehörde Marzahn-Hellersdorf
- Bezirksamt Mitte
- Straßen- und Grünflächenamt
- Bezirksamt Neukölln
- Straßen- und Grünflächenamt
- Bezirksamt Pankow
- Straßen- und Grünflächenamt - Sondernutzungen
- Bezirksamt Reinickendorf
- Straßen- und Grünflächenamt
- Bezirksamt Spandau
- Straßen- und Grünflächenamt
- Bezirksamt Steglitz-Zehlendorf
- Straßen- und Grünflächenamt - Tiefbau- und Grünflächenverwaltung
- Bezirksamt Tempelhof-Schöneberg
- Straßen- und Grünflächenamt
- Bezirksamt Treptow-Köpenick
- Straßen- und Grünflächenamt