BERLINEN
  1. ServicePortal Berlin
  2. Services
  3. Umwelt, Natur und Tiere
  4. Noise protection - apply for a permit or exemption

Noise protection - apply for a permit or exemption

Lärmschutz - Genehmigung oder Ausnahmezulassung beantragen
Machine translation of the German page, 2026-09-15. The German original is binding.
Current notices about this service Longer processing time for applications Due to a technical changeover, applications can currently be submitted but cannot be processed by the responsible authority. We ask for your patience and understanding.

Book an appointment

Book an appointment (service.berlin.de)

Requirements

• no requirements

Documents you need

• Application for approval or exemption from noise protection regulations Please submit the application preferably online to ensure prompt processing. Written applications by email or post are legally permissible in exceptional cases, but extend the processing time. • For online applications: Please have all required documents and evidence ready for upload in PDF, JPG, or PNG format. Permitted file size: 10 MB per file, 80 MB in total; maximum file name length: 90 characters. • The longer processing time for informal written applications by email or post may result in an increased administrative fee. • Information on persons involved in the project • Name and address of the applicant (person placing the order) • Name and address of the person carrying out the project (commissioned by the person placing the order), and, if applicable, power of attorney for submitting the application • Contact details of the responsible person on site who can be reached at all times during the applied-for project. • Details on the type of project • Information on the location of the project (address) • Date/period of the project • Name and brief description of the project • Description of the location (e.g. distance to the nearest residential development) • Justification of the necessity of the project Briefly explain why the project is necessary and should take precedence over the standard noise protection for residents (for projects at nighttime or on Sundays and public holidays). • Organizational details Statements on the extent of the expected noise disturbance, e.g. regarding • Number of participants, arrangements for the required setup and dismantling work, delivery traffic, timing, duration, and volume of any sound checks for outdoor music events, arrangement and output of loudspeakers, expected impact on the nearest residents. • In special cases, submission of further documents such as site plans, sketches of stage locations, or similar may become necessary. • Technical details List of the possible technical noise sources and their arrangement, as well as details of the type, manufacturer, device number, and year of manufacture of the machines and equipment used. • Description of the intended noise protection measures For example, use of low-noise generators / devices / machines, use of headsets / walkie-talkies, enclosure of equipment • if applicable, proof of an existing fee exemption gesetze.berlin.de/perma?j=UmwGebV_BE_!_2

Forms

• Application for approval, order, or exemption permit for outdoor events of city-wide significance (Senatsverwaltung/Senate Department) (Note: full form functionality is only available when opened directly with a PDF program, or when saved first and then opened with a PDF program) www.berlin.de/sen/uvk/_assets/umweltschutz/service/formulare

Fees

• 400,00 to 7.000,00 euros: for large public outdoor events • 100,00 to 1.500,00 euros: for other public outdoor events • 130,00 to 2.135,00 euros: for projects for commercial purposes • 50,00 to 425,00 euros: for other projects • 25% of the fee for the underlying permit, but at least 110 euros: for minor changes • 50% of the fee for the underlying permit, but at least 110 euros: for substantial changes These figures are examples; for further details and binding fee ranges, please refer to the applicable Umweltschutzgebührenordnung (Environmental Protection Fees Regulation). Certain applicants are exempt from the fees. Exemption from the fee obligation must be proven.

Legal basis

Bundes-Immissionsschutzgesetz (BImSchG) [Federal Immission Control Act] www.gesetze-im-internet.de/bimschg/ • 18th Ordinance under the Federal Immission Control Act (18. BImSchV) www.gesetze-im-internet.de/bimschv_18/index.html#BJNR0158809 • Landes-Immissionsschutzgesetz Berlin (LImSchG Bln) [Berlin Immission Control Act] §§ 10, 11 gesetze.berlin.de/perma?j=ImSchG_BE • Veranstaltungslärm-Verordnung (VeranstLärmVo) [Ordinance on Noise from Events] gesetze.berlin.de/perma?a=FVeranstGerImSchV_BE • Ausführungsvorschriften zum Landes-Immissionsschutzgesetz Berlin (AV LImSchG Bln) [Implementing Provisions for the Berlin Immission Control Act] www.berlin.de/sen/uvk/_assets/umweltschutz/service/rechtsvor • Berliner Umweltschutzgebührenordnung (UGebO) [Berlin Environmental Protection Fees Ordinance] gesetze.berlin.de/perma?d=jlr-NNLBE00004769NN00000000030 • Berliner Umweltschutzgebührenordnung (UGebO) § 2 - Personal fee exemption gesetze.berlin.de/perma?j=VwGebO_BE_!_2

Processing time

Applications must generally be submitted four weeks before the start of the project. If your application deadline is shorter, you should contact the responsible authority immediately.

Further information

• Examples of the division of responsibilities between the districts and the Senatsverwaltung (Senate Department) for the immission-control authorities in construction work and similar projects (Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umwelt [Senate Department for Mobility, Transport, Climate Action and the Environment]) www.berlin.de/sen/uvk/_assets/umwelt/laerm/informationen-zum • Information on Noise Protection (Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umwelt) www.berlin.de/sen/uvk/umwelt/laerm/informationen-zum-laermsc • Noise Protection at Events (Umweltportal [Environmental Portal]) www.berlin.de/umwelt/themen/laerm/artikel.256227.php • Event - Apply for a Permit (Dienstleistung [service]) service.berlin.de/dienstleistung/324911

Who is responsible

Bezirkliches Umwelt- und Naturschutzamt (district environmental and nature conservation office) or Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umwelt (Senate Department for Mobility, Transport, Climate Action and the Environment)

Responsible for you

Choose a location; the appointment itself is booked on the original page.

Original

German original

Service number 325891 · same path as the original: service.berlin.de/dienstleistung/325891/