  4. Immissionsschutz (protection against harmful environmental impacts) - File a complaint about a construction site

Immissionsschutz (protection against harmful environmental impacts) - File a complaint about a construction site

Immissionsschutz - Beschwerde über eine Baustelle einreichen
Machine translation of the German page, 2026-09-15. The German original is binding.
Current notices about this service Longer processing time for applications Due to a technical changeover, applications can currently be submitted but cannot be processed by the responsible authority. We ask for your patience and understanding.

Book an appointment

Book an appointment (service.berlin.de)

Requirements

• Presence of a current significant immission (Immission – harmful environmental impact, e.g. noise or dust) from construction work at a building site

Documents you need

• Complaint about a significant, ongoing nuisance (Immission) caused by a construction site Possible online or by phone. Information hotline for construction site complaints: • Monday to Friday, 9:00 am to 11:00 am • Phone number: (030) 9025-2253 • Information about the construction site and the type of nuisance The complaint should include the following information: • Your name and address (anonymous complaints are also possible) • If you are submitting the complaint on behalf of another person: a power of attorney (Vollmacht) with the name and address of the person on whose behalf you are acting • If you can name witnesses for your complaint: name and address of the witness • If you know the client/building owner (Bauherrin/Bauherr): their name and address • If you know the company carrying out the construction work: its name and address, and if possible a contact for the person responsible on site during the construction work • Address of the construction site • Description of the nuisance (Immission): what exactly does the nuisance consist of? • Date and time period of the nuisance • Description of the work carried out and the machinery used • Photos of the activity at the construction site (if available)

Fees

None

Legal basis

• Bundes-Immissionsschutzgesetz (BImSchG, Federal Immission Control Act) § 22 www.gesetze-im-internet.de/bimschg/__22.html • Landes-Immissionschutzgesetz Berlin (LImSchG Bln, Berlin State Immission Control Act) § 2 gesetze.berlin.de/perma?j=ImSchG_BE_!_2

Further information

• Responsibilities for complaints about noise (Senatsverwaltung für Umwelt [Senate Department for the Environment]) www.berlin.de/sen/uvk/umwelt/laerm/informationen-zum-laermsc • Construction noise brochure (Senatsverwaltung für Umwelt) www.berlin.de/sen/uvk/umwelt/laerm/baulaermbroschuere/ • Information on noise protection (Senatsverwaltung für Umwelt) www.berlin.de/sen/uvk/umwelt/laerm/ • Information on noise (Umweltportal Berlin [Berlin Environmental Portal]) www.berlin.de/umwelt/themen/laerm/

Who is responsible

Information hotline for construction site complaints • Mondays to Fridays from 9:00 am to 11:00 am • Telephone number: (030) 9025-2253

Responsible for you

Choose a location; the appointment itself is booked on the original page.

Original

German original

Service number 350887 · same path as the original: service.berlin.de/dienstleistung/350887/